|
P R O J E C T D E S C R I P T I O N
Increased commerce led to the planning of this new storage, handling, and distribution center. GDA developed a master plan for a 180,000 sf structure accessing truck docks and rail lines on two sides of this 10 acre site. Phase I (53,000 sf warehouse and 3,000 sf office) was built in a manner that allowed the existing warehouse to remain productive. Expansive clear spans and 30' ceilings were incorporated into the new metal building. A galvalume roof was selected for a maintenance-free, long lasting "cool roof."
CLIENT: A&S Warehousing & Distribution LOCATION: Inwood, WV STATUS: Complete COST: $2,000,000 |